PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripped Elev. 5-6 2nd Floor Facing South (800x600).jpg Securing the shear wall panels at Elev. 4-Stair -2 Facing South (800x600).jpg Stripped Elev. 5-6 2nd Floor Facing South-West (800x600).jpg Lifting the Slip Forms at Elev. 1,2,3 2nd Floor Facing South -2 (800x600).jpg Backfilling Elev 5-6. pit Foundation Walls Facing North (800x600).jpg Backfilling Elev 5-6. pit Foundation Walls Facing West (800x600).jpg Lifting the Slip Forms at Elev. 1,2,3 2nd Floor Facing South (800x600).jpg
Previous pageNext page Stripped Elev. 5-6 2nd Floor Facing South-West (800x600)
Stripped Elev. 5-6 2nd Floor Facing South-West (800x600)